What Happens at Each Kitchen Design Meeting

Brad Smith
Author: Brad Smith

By the time the old cabinets come out, nearly every decision about the new kitchen has already been made, weeks earlier, at a showroom table covered in door samples. Homeowners who enjoy that part tend to know what each meeting is for. They also turn up with the information the designer needs, which saves a round of emails later.

What Happens At Each Kitchen Design Meeting

Why the design stage takes several weeks

A quote can’t be accurate until someone has measured the room, and you can’t lock in selections before you’ve seen the finishes in person. So the sessions happen in order.

Rushing them shows up later as variations. A variation after the cabinets have gone into production is the expensive kind, because by then the panels are already cut.

How the design stage runs, step by step

Most custom cabinet studios follow something close to the order below. That holds whether they build in their own factory or send drawings out to a separate joinery shop.

How The Design Stage Runs, Step By Step

First contact

This is normally a phone call or an online form, and the questions are about the room and roughly what you want to spend. If the numbers and the scope don’t match, a good studio will tell you now, before you drive across town.

The showroom visit

The first proper meeting is usually the longest. You’ll talk about how you cook and what drives you mad about the current layout. Mention who else uses the kitchen, too.

Open the drawers while you’re there. Put some weight in one and let the soft-close runner pull it shut.

Give the designer an actual budget figure, even a tight one. The first draft is drawn to whatever number you give, and if you give none it comes back as a guess.

The site measure

Someone comes to the house with a laser measure and a notepad. Wall lengths are the easy part. They also check whether the walls are plumb and mark exactly where the plumbing and power points sit.

Older Brisbane homes, Queenslanders in particular, rarely have square corners after decades of the stumps settling. Six millimetres of drift along a long wall is common. If nobody records it, you find out on installation day, when a gap opens up beside the end panel.

Clear the benchtops beforehand so they can get a tape into the corners.

Design and quote review

You’ll get a floor plan plus an elevation of each wall. Many studios also produce a render, and 3D visualization is the easiest way to spot something like a corner drawer that hits the oven handle before it’s built.

Make your changes here, while they only cost a redraw. Moving a sink after installation usually needs a plumber, and often a new benchtop cut-out as well.

Read the quote line by line and ask what’s excluded. Plumbing reconnection and electrical work are the items most often missing.

Final selections

Everything you can see gets locked in at this meeting, from the door colour down to the handles. Ask to see each finish at full size, or at least on a large sample board. A white that looks crisp on a 75 mm chip can look cold across four and a half metres of doors.

Once you sign, the order goes to production and later changes are charged.

Who carries the job from here depends on the studio. Some hand the signed drawings to an outside joinery shop, while others build their own. Action Kitchens in Capalaba is one of the kitchen designers in Brisbane that designs and manufactures in-house, so the drawings don’t change hands before the panels are cut. Ask which arrangement you’re getting before you sign, and whether you can take the drawings elsewhere for a second price.

What to bring to the first meeting

What To Bring To The First Meeting

Custom cabinetry is usually drawn around the exact oven and dishwasher you plan to buy, so bring the model numbers. If you haven’t picked appliances yet, do that first, even if it pushes the showroom visit back a week. A dishwasher swapped after sign-off can turn out a few millimetres taller than the cavity it was drawn for.

Photos or a rough floor plan of the current room help. So do pictures of kitchens you like, and one or two you don’t.

Agree on a budget range with your partner at home. Working it out in the showroom, in front of the designer, rarely goes well.

The most useful thing to bring takes a week to make. Leave a notepad on the bench and write down every time the kitchen gets in your way: the drawer that hits the fridge door, the corner nobody can reach. Designers often get more from that list than from any inspiration photo. Add anything that can’t move, like a window you’re keeping or a load-bearing wall.

Frequently asked questions

How many design meetings should you expect?

Four in person is typical, from the showroom visit through to final selections. A bigger job often needs a second design review once the first round of changes comes back.

Do you pay for the design?

Some studios charge a design fee and credit it against the order if you go ahead. Others build it into the cabinet price. Find out which before the site measure.

Can you take the drawings to another cabinetmaker?

Only if the agreement allows it. Paying a design fee doesn’t always mean you own the drawings. Plenty of studios keep them until a contract is signed, so ask at the start.

Before you book anything

Write down your appliance model numbers and the budget range you’ve agreed on, then call the showroom. Hold off on setting a demolition date until final selections are signed. You’ll be cooking in the old kitchen right up until the new cabinets arrive, and any delay at the selections stage pushes the whole job back.